We
Need a Comprehensive Upgrade of 301 – Not a Band-Aid Bypass!
On
June 20th, the citizens of Charles County learned the Tri County
Council of Southern Maryland has named the Waldorf Bypass a top priority. Specifically, the Council’s FY 2008 “Regional
Transportation Needs Inventory” identifies two “Top Regional Priorities”. The first is “Western Bypass of Waldorf (U.S. 301 Waldorf Area Transportation
Improvements). Construct a western
Bypass of Waldorf, with controlled access.
Construct a Limited Upgrade of
U.S. 301 in Waldorf area to facilitate traffic flow and relieve congestion
at failing intersections.”
Prior
to the Council action the Charles County Board of Commissioners, on May 9th
established County transportation priorities calling for the construction of
the western Waldorf bypass and pursue limited upgrade of the most congested
U.S. 301 intersections. The limited
upgrade was identified in the presentation as Alternate 1A which provides for
some overpasses at congested intersections in Waldorf. The Commissioners approved these priorities
by a vote of 4 to 1. Commissioner
Collins opposed establishing the priorities pending completion of the Draft
Environmental Impact Statement (DEIS) now being prepared by the U.S. 301
Waldorf area interagency study group.
It
is important to note that in 1993 a letter from SHA advised our Commissioners
that no overpasses will be considered in Waldorf until such time as a bypass is
an impossibility.
In
order to receive Federal highway funding an agreed, approved Environmental
Impact Statement is required. This study
must examine all alternatives and recommend the alternative which satisfies the
purpose and needs of the project with the least impact on the environment and
wetlands of U.S. waters, unless there are overriding social and economic
considerations. The stated purpose and need
of the current study is to “Improve local traffic operation along U.S. 301 in
the Waldorf area, and facilitate the safe and efficient flow of through traffic
and commuter traffic between the Waldorf area and the Washington metropolitan
area….”
Unfortunately,
this insistence on a western Waldorf bypass by the Commissioners is nothing
new. In 1998 – 2001, the State Highway
Administration (SHA) and the Federal and Maryland cooperating agencies prepared
a Preliminary Draft Environmental Statement addressing U.S. 301 in the Waldorf
area. This statement was not circulated
for final approval and a DEIS was never presented to the public for comment. The Environmental Protection Agency (EPA)
commented that if a bypass was recommended they would consider giving the
document and adverse rating and recommend that the U.S. Army Corps of Engineers
(COE) deny a Clean Water Act, Section 404 permit. EPA has responsibility for rating the DEIS and
the COE must issue a 404 permit to allow work in wetlands. The COE initially commented that an upgrade
was the only acceptable alternative; however, they later advised that a western
bypass was the most environmentally damaging alternative, an eastern bypass may
be permitable, and they were willing to further study the eastern bypass. Subsequently, in 2001 at a public meeting
between SHA and the Charles County Board of Commissioners, the President of the
Board advised SHA, we will not go east and we will not go through Waldorf. SHA advised that there was no point in
further study, and progress on the DEIS ended.
Later, in March 2002, the Board approved a Transportation Network
Strategy calling for a western Waldorf bypass citing the need to minimize impacts
on businesses.
The
State has budgeted five million dollars for a new study and the Interagency
Group held their first meeting on the current study in January 2006, with
public workshops held in March this year.
The next step, now underway, is the selection of alternatives to be
included in the DEIS. The alternatives
in the new study are essentially the same as those in the previously discarded
study, and all of the alternatives end in the vicinity of the Turkey Hill
Road/U.S. 301 intersection, moving the traffic congestion to La Plata. What has not been seen in either study is an
upgrade alternative in Waldorf using urban highway design, minimizing impact on
the businesses.
We
are concerned that once again our tax monies will be spent preparing a study
which will never be completed because our Board insists on a western bypass of
Waldorf. If our aim is the relief of
traffic congestion, the study should be allowed to proceed, recommending the
preferred solution satisfying the approved purpose and need. If our Board once again will accept only a
western bypass of Waldorf, then we are concerned that once again Waldorf will
receive no significant highway improvements and traffic congestion will
continue to grow worse.
The
Charles County Board of Commissioners needs to respond to two questions!
1) Why are they insisting on the “most
environmentally damaging alternative”?
2) Why have they not insisted that SHA develop a
U.S. 301 upgrade through Waldorf, based upon urban design with underground storm
drainage minimizing the impact on the business community?
----Ernie Wallace